HELI's first hybrid empty container handler delivered to Pearl River Port

With the increasing demand for high efficiency, convenience and energy saving for empty container transshipment and stacking in ports and yards, recently, HELI's first 7-layer hybrid empty container handler was officially delivered to Zhuhai Port. The launch ceremony was held in Zhuhai, Guangdong Province.


This product is equipped with the development of 600V high-voltage electrical system, multi-channel intelligent heat dissipation system, coupled range extender control system and other technologies, with environmental protection, safety, energy saving, high efficiency, comfort, low cost, etc. Advantages, the fuel saving rate can reach 50%, the super capacitor can be used 300,000 times, and it can achieve "zero emissions" under pure electric working conditions. During the entire vehicle lifecycle (taking 500,000 boxes as an example), compared with internal combustion equipment, it can reduce the emission of at least 125 tons of standard coal. Heli provides comprehensive professional technical support to ensure the life of the vehicle, reduce equipment downtime and ensure efficient operation of the vehicle.

Product Inquiry
×